
GREENCORE ENERGY: SOLAR TRACKER MOUNTING SYSTEM COMPONENTS
10,000+ parts for solar installations across 5 Indian states
Results Achieved
Compared to imported solar tracker hardware from European suppliers.
Zero delivery delays across 5 sites over 3 months.
Brackets and machined components across all sites.
GreenCore's trackers increased energy yield by 27% — above the industry average of 22%. The 25-year corrosion warranty was backed by independent salt spray test certification.

The Breakdown
Industry: Clean Energy
Why MetalMarket Technologies?
GreenCore Energy is a Rajasthan-based renewable energy company deploying a proprietary single-axis solar tracker system across large-scale solar farms. They needed high-volume manufacturing of structural brackets and precision drive components.
About The Company
GreenCore Energy is a Rajasthan-based renewable energy company deploying a proprietary single-axis solar tracker system across large-scale solar farms. They needed high-volume manufacturing of structural brackets and precision drive components.
The Challenge
Coordinating staggered deliveries of 12,000+ parts across 5 states with just-in-time logistics was the primary challenge.
- 10,000+ mounting brackets and 2,000+ precision machined worm gear housings needed
- Staggered delivery across a 3-month deployment window
- Structural brackets required hot-dip galvanizing for 25-year outdoor durability
- Gear housings needed ±0.01mm accuracy for smooth tracking motion
Late parts meant delayed megawatt installations and delayed revenue — each day of delay cost GreenCore approximately ₹5 lakhs in lost energy generation.
The Solution
Metal Market coordinated multi-facility production with staggered deliveries to 5 different installation sites across Rajasthan, Gujarat, Tamil Nadu, Karnataka, and Andhra Pradesh — turning a logistical nightmare into a seamless supply chain.
Multi-Facility Production Plan
- Three manufacturing partners: sheet metal, CNC machining, and galvanizing
- Coordinated logistics to 5 installation sites
- Rolling 14-day delivery schedule matching installation timeline
Durability & Quality Assurance
- Independent salt spray testing for 25-year corrosion warranty
- Hot-dip galvanizing per IS 4759 standards
- Dimensional verification on every batch
- Just-in-time delivery to minimize site storage needs
“Metal Market turned what should have been a logistical nightmare into a seamless supply chain. They understood that for us, late parts mean delayed megawatts and delayed revenue.”
— Sanjay Gupta, COO, GreenCore Energy
Why This Partnership Worked
Multi-site logistics coordination
25-year corrosion durability certification
Zero delivery delays across 5 states
55% cost savings over imported hardware
Just-in-time delivery matching installation schedule
Complete quality documentation for every batch
Ready to start your success story?
Get an instant quote and bring your product to life.
Get an instant quote